KC—03KingstonCarpentry & Timber
03 / 0604 stages · 05 disciplines
  1. Drawings
    Kingston Carpentry hard hat on construction drawings
    We read the architecture and engineering first, then walk the site and agree on scope, sequence and schedule.
  2. Ground
    Concrete stairs with lights in the risers between planted concrete terraces.
    Layout, forming and concrete. The foundation sets every line that follows.
  3. Frame and envelope
    One carpenter on a wall handing hardware down to another beside membrane-wrapped walls.
    Framing, timber and steel, then sheathing and membrane to close the building in.
  4. Finish
    A kitchen with a long concrete-topped island, plywood-edged cabinets and dark exposed ceiling beams.
    Interior detail, timber frames and installations, finished to the drawings and walked through together.

Disciplines

Concrete

D.01 · Foundations and formed work

Framing

D.02 · Floors, walls and roofs to lock-up

Timber

D.03 · Traditional timber frames, designed and cut

Envelope

D.04 · Sheathing, membrane and cladding

Finishing

D.05 · Interiors, fireplaces and furniture