KingStonCarpentry & Timber

Timber installation

sequence

The timber installation on the cabin, after the floor system, framing, sheathing and membrane.

Date
08.2026
Project
Private cabin
Location
Salt Spring Island, BC
Discipline
Timber installation
Material
Timber
Status
Recorded
A crew working on a finished subfloor deck with tall posts standing along its edge, among trees above the water.
Subfloor down and posts standing, above the water
A carpenter at a workbench on a framed deck, with sheathed walls, beams set and ladders around him.
Walls sheathed, beams set
One carpenter on top of a wall reaching down to take hardware from another, beside walls wrapped in membrane.
Handing up hardware at the beam line